Construction Health and Safety Group CHSG
Contents |
[edit] Introduction
The Construction Health and Safety Group (CHSG) was formed in 1952. Its original name was The London Building and Engineering Construction Accident Prevention Group but the organisation changed its name (after several other iterations) to The Construction Health and Safety Group in 1976.
[edit] Purpose
The Construction Health and Safety Group is a national provider of training and support to members of the construction industry and its associated professions. Its goals are:
- To protect and preserve occupational health and safety in the construction industry.
- To study aspects of the industry and related operations necessary to improve occupational health and safety and arrange and provide suitable training to meet those needs.
- To foster and develop cooperation between government, employers and trade unions in matters concerning health and safety.
[edit] Alliances
The Construction Health and Safety Group maintains ties with several safety organisations, including the Health and Safety Executive (HSE), British Standards (BSI), British Safety Council, The Royal Society for the Prevention of Accidents (RoSPA), Institution of Occupational Safety and Health (IOSH), National Examination Board in Occupational Safety and Health (NEBOSH), Construction Industry Training Board (CITB), Mental Health First Aid England (MHFA England), British Occupational Hygiene Society (BOHS) and Institution of Fire Engineers (IFE).
The organisation can offer accredited courses as a result of these affiliations.
[edit] Related articles on Designing Buildings Wiki
- Construction fire safety responsibility and competence matrix.
- Construction Industry Training Board CITB.
- COVID-19 and mental health within construction firms.
- Fire.
- Fire safety training.
- Health and safety.
- Health and Safety Executive HSE.
- Mental health in the construction industry.
- Safety in the construction industry.
- The Importance of Health and Safety Training.
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.